    2025-FO-0005-001-E

    Work with the prime award recipients that had subaward reporting deficiencies to ensure that their subaward information is reported or reported accurately.

  •  
    Status
      Open
      Closed
    2025-FO-0005-001-F

    Update and expand the guidance provided to prime award recipients by (1) updating program website(s) with comprehensive information about FFATA, (2) implementing training, (3) issuing formal communication, and (4) implementing a feedback mechanism to ensure that all prime award recipients have the opportunity to share challenges with HUD and ask questions.

  •  
    Status
      Open
      Closed
    2025-FO-0005-001-G

    Integrate FFATA reporting requirements into the program monitoring procedures for all programs and conduct regular reviews to assess compliance.

Office of Administration

  •  
    Status
      Open
      Closed
    2024-OE-0007-01

    Revise HUD’s Controlled Unclassified Information Policy to include the anti-gag provision.

  •  
    Status
      Open
      Closed
    2024-OE-0007-02

    Revise HUD’s Controlled Unclassified Information Policy to state that (a) nondisclosure forms and agreements must include the anti-gag provision as required by law and (b) confidentiality clauses in personnel settlement agreements must include the anti-gag provision if the clause restricts disclosure of any other information beyond the terms and conditions of the agreement itself.

Office of Administration

  •  
    Status
      Open
      Closed
    2023-OE-0007-05

    HUD’s Privacy Office should require program offices to periodically review systems in all environments (testing, development, production) for unnecessary disclosure of personally identifiable information (PII).

Office of Administration

  •  
    Status
      Open
      Closed
    2023-OE-0001-20

    HUD’s Office of Administration, in coordination with OCIO, should update and communicate its PII minimization plan. The plan should include detailed procedures to regularly review and remove unnecessary PII collections in accordance with OMB Circular A-130 (IG FISMA metric 35).

Office of Administration

  •  
    Status
      Open
      Closed
    2023-BO-0002-001-E

    We recommend that the Chief Procurement Officer update HUD’s field service manager contract monitoring plan and FSM qualitative monitoring databases used to monitor contractor performance to align with the QASP and contractual requirements as noted in recommendation 1G below.

Lead Hazard Control

  •  
    Status
      Open
      Closed
    2021-OE-0011b-01
    Prioridad
    Priority

    We believe these open recommendations, if implemented, will have the greatest impact on helping HUD achieve its mission to create strong, sustainable, inclusive communities and quality affordable homes for all.

    Update HUD regulations, policies, and procedures following the regulatory process required by the amended Lead Safe Housing Rule, in consideration of CDC’s lowered BLRV of 3.5 ug/dL.


    Status

    On June 12, 2024, the Office of Lead Hazard Control and Healthy Homes informed HUD OIG that the draft Federal Register notice of its request for information from Lead Safe Housing Rule stakeholders and the general public on its proposal to adopt CDC's BLRV of 3.5 µg/dL as its EBLL under the rule has been circulated for OGC and preclearance review, which will be followed by Departmental clearance. OLHCHH plans on publishing the Federal Register notice by June 30, 2024, with a 60-day comment period. OLHCHH will provide the link and the link and the notice once it is published. OLHCHH will then review public comments in preparing to decide whether to change the rule's current level, and if so, to what level.

    The Office of Lead Hazard Control and Healthy Homes estimated this will be completed by June 30, 2024.


    Analysis

    To fully address this recommendation, OLHCHH must provide evidence that it has updated its regulations, policies, and procedures so that they are consistent with CDC’s lowered BLRV of 3.5 ug/dL.

    Alternatively, OLHCHH must establish that its research led it to determine that environmental interventions in cases of children with EBLLs between 3.5 and 4.9 µg/dL were ineffective in reducing the children’s blood lead levels and that lowering HUD’s EBLL regulation to 3.5 µg/dL is unnecessary.

    Implementation of this recommendation will help ensure children living in public housing with EBLLs receive effective environmental interventions.

Lead Hazard Control

  •  
    Status
      Open
      Closed
    2023-IG-0001-001-A
    Prioridad
    Priority

    We believe these open recommendations, if implemented, will have the greatest impact on helping HUD achieve its mission to create strong, sustainable, inclusive communities and quality affordable homes for all.

    Update applicable requirements to require assisted property owners, including PHAs, to maintain adequate documentation to support their determinations that maintenance and hazard reduction activities that disturb surfaces with lead-based paint qualify for the de minimis exemption from the lead-safe work practices under the Lead Safe Housing Rule.


    Status

    To address this recommendation, OLHCHH agreed to:

    • Issue a notice to assisted target housing owners and public housing agencies on the de minimis exception citing the correct application of the de minimis threshold; describing appropriate documentation methods for the application of the de minimis threshold; and recommendations of best practices for documenting applications.
    • Collect additional data regarding the use of the de minimis threshold, including information on how private and public housing owners: (a) determine how much paint in target housing will be disturbed during a maintenance or rehabilitation project; (b) use the paint disturbance area information; (c) monitor the amount of paint disturbed in projects that are designed to disturb de minimis amounts of paint in target housing.
    • Design and conduct webinars, including at least one for each program office’s major categories of stakeholders on requirements and best practices pertaining to the de minimis exception under the Lead Safe Housing Rule and its implementation; record the webinars on the HUD website (e.g., on HUD Exchange) for future viewing by stakeholders; and conduct outreach promoting the webinars

    The Office of Lead Hazard Control and Healthy Homes had drafted guidance on the de minimis exception to the Lead Safe Housing Rule for PIH, Multifamily Housing, and CPD and submitted it through the clearance process on September 26, 2024, with an October 9, 2024, due date. Through October 17, six concurring comments were received as was one non-concurring comment. The OLHCHH continues to revise the draft guidance in consideration of the comments. In May 2023, HUD published a final rule establishing a new approach to defining and assessing housing quality: The National Standards for the Physical Inspection of Real Estate. Public Housing regulations were amended, and Public Housing program participants were required to comply with this final rule and use the NSPIRE standards starting July 1, 2023. The Real Estate Assessment Center and Office of Field Operations will collaborate with the Office of Lead Hazard Control and Healthy Homes, the Office of Policy Development and Research, and a statistician to evaluate data collected under the NSPIRE inspection program to estimate the number of public housing developments and associated units that contain lead-based paint and lead-based paint hazards. As of November 2024, PIH reported that inspections have had a slow start due to procurement delays. Additionally, the NSPIRE system did not get the requested functionality to collect lead inspections. The final action target date is March 31, 2025.


    Analysis

    To implement this recommendation, HUD needs to provide evidence that it has implemented the three actions OLHCHH agreed to complete.

    Implementation of this recommendation and associated corrective actions will ensure assisted property owners are sufficiently informed regarding the requirements to support their determinations that maintenance and hazard reduction activities that disturb surfaces with lead-based paint qualify for the de minimis exemption from the lead-safe work practices under the Lead Safe Housing Rule and that assisted property owners are conducting this work safely, thereby ensuring households are residing in safe and healthy HUD-assisted housing.

Office of Administration

  •  
    Status
      Open
      Closed
    2022-CH-0002-001-A

    Ensure that future policies and guidance developed to return HUD’s offices to normal operations include the specific criteria, metrics, and defined geographic area to be used by all offices as applicable.

  •  
    Status
      Open
      Closed
    2022-CH-0002-001-B

    Develop and implement sufficient policies and controls to ensure that (1) applicable criteria in any future guidance are met and all safety measures are sufficiently completed before returning HUD’s offices to normal operations and (2) sufficient documentation is maintained to support that the applicable criteria were met.

Lead Hazard Control

  •  
    Status
      Open
      Closed
    2020-OE-0003-07

    Provide the MOU with EPA designed to address radon contamination.

Office of Administration

  •  
    Status
      Open
      Closed
    2021-PH-0002-001-B

    We recommend that HUD’s Chief Administrative Officer implement the corrective actions and internal process improvements in internal control developed as a result of the Chief Financial Officer’s investigation addressed in recommendation 1A.

  •  
    Status
      Open
      Closed
    2021-PH-0002-001-C

    We recommend that HUD’s Chief Administrative Officer provide training to responsible staff and officials to ensure that those that may be involved with negotiating any GSA rent credits, like the credits addressed in this report, identify such potential rent credit transactions and follow the corrective actions and process improvements implemented to resolve recommendation 1B.

Office of Administration

  •  
    Status
      Open
      Closed
    2020-OE-0001-17
    Sensitive
    Sensitive

    Sensitive information refers to information that could have a damaging import if released to the public and, therefore, must be restricted from public disclosure.

    The OIG has determined that the contents of this recommendation would not be appropriate for public disclosure and has therefore limited its distribution to selected officials.

Office of Administration

  •  
    Status
      Open
      Closed
    2019-OE-0002a-01

    Designate a Senior Agency Official for Records Management at the Assistant Secretary level or its equivalent.

  •  
    Status
      Open
      Closed
    2019-OE-0002a-02

    Update and issue agency formal records policy, including detailed procedures and requirements for completing and maintaining program office and agencywide inventories of systems, records, and PII.

  •  
    Status
      Open
      Closed
    2019-OE-0002a-03

    Update and obtain final NARA approval of all HUD records retention schedules, including the Capstone email schedule, to comply with Federal requirements, including OMB M-19-21.

  •  
    Status
      Open
      Closed
    2019-OE-0002a-04

    Develop and approve an enterprise strategy to meet all M-19-21 electronic transition requirements.